- The Above Photos show the AC Water Leaking from the Copper Pipe running Horizontally
- Proper Sealing @ Joints and inlets are the reason
- Collection Pipe has to be installed to collect the water to the floor, similar to rainwater pipe from roof to flor
Athikullam Plinth Beam Pre RCC |
Debris and Column soil being removed from site |
Cross section of Plinth Beam connecting all columns |
Prior to Earth filling & consolidation & river sand / PCC flooring |
Beam near OPEN WELL, Having 20mm Cantliver rod |
Plinth Beams ready for Shuttering & cover block in bottom fixing |
No comments:
Post a Comment